Temporary BMPs

Temporary Best Management Practices (BMPs) are the cornerstone of stormwater compliance during active construction. They’re the first line of defense against sediment discharge, runoff pollution, and costly regulatory violations.

Get in Touch

At Red River Storm Water, we design, install, and maintain temporary erosion and sediment control measures for projects across multiple regions, ensuring your site remains compliant with EPA, NPDES, TCEQ and local stormwater requirements from groundbreaking to stabilization.

Our team combines national expertise with on-the-ground precision to deliver BMP solutions that work in every environment, for every project scale.

The Purpose of Temporary BMPs in Construction Compliance

Construction activity inherently disturbs soil, vegetation, and drainage patterns. Without proper BMPs in place, rainfall and runoff can carry sediment, debris, and pollutants directly into nearby waterways. This runoff not only threatens environmental quality, it can also result in permit violations, fines, and project delays.

Temporary BMPs serve as short-term protective controls that manage these risks while permanent stabilization is being established. They’re required under the EPA’s National Pollutant Discharge Elimination System (NPDES) Construction General Permit and most state-issued stormwater permits.

At Red River Storm Water, we help you meet these requirements efficiently with BMP programs that integrate seamlessly into your overall Storm Water Pollution Prevention Plan (SWPPP).

Comprehensive Temporary BMP Services

Every project requires a unique combination of BMPs to control erosion, manage sediment, and prevent offsite discharge. Our certified inspectors and installation teams provide full-service support for temporary BMP design, implementation, maintenance, and documentation.

Planning and Design

Before installation begins, our specialists perform a complete site assessment to identify high-risk areas such as slopes, drainage channels, and material storage zones. We use that data to create a site-specific BMP plan that:

  • Controls runoff velocity and direction.
  • Prevents sediment transport to adjacent properties or storm drains.
  • Complies with federal, state, and local permitting standards.
  • Aligns with your SWPPP’s inspection and reporting framework.

The result is a fully integrated plan that minimizes environmental risk and simplifies compliance management.

Installation

Our installation crews are trained in current BMP standards and field-tested procedures. We use high-quality, compliant materials and proven anchoring methods to ensure durability even under heavy rainfall or equipment traffic. Common temporary BMP installations include:

  • Silt Fences & Fiber Rolls (Wattles): Trap sediment and slow runoff at the perimeter of disturbed areas.
  • Inlet Protection Devices: Shield storm drains and catch basins from debris and sediment entry.
  • Check Dams: Reduce flow velocity in channels and ditches, promoting sediment deposition.
  • Sediment Basins & Traps: Capture and contain runoff for gradual, filtered discharge.
  • Construction Entrances & Vehicle Tracking Pads: Minimize mud and sediment transfer to public roads.

We adapt installation methods to suit terrain, rainfall frequency, and soil conditions ensuring maximum performance in every region.

Inspection and Maintenance

Even the best BMPs need consistent oversight to stay effective. Red River Storm Water provides routine inspections and maintenance services at intervals required by your permit (typically every 7 or 14 days, or after qualifying rain events).

Our team performs:

  • Visual inspections of all BMPs to confirm integrity and functionality.
  • Sediment removal, replacement, or repair as needed.
  • Photo documentation and inspection reports for audit readiness.
  • Corrective-action tracking to verify compliance restoration after any deficiencies.

BMP Removal and Transition

When permanent stabilization is achieved, we manage the safe removal of temporary BMPs to prevent secondary disturbance. We also document stabilization conditions and update your SWPPP for final closeout. Our focus is minimizing rework while maintaining compliance through every project milestone.

Certified Compliance You Can Depend On

Our BMP teams are led by CPESC (Certified Professional in Erosion and Sediment Control) and CESSWI (Certified Erosion, Sediment, and Storm Water Inspector) professionals which are two of the highest credentials in the field. These certifications ensure your BMP installations are designed and maintained according to industry best practices and permit standards.

We also stay up to date with EPA, TCEQ, and state-level guidelines across all regions of operation. Red River Storm Water brings consistent, certified compliance everywhere construction happens.

Why Proper BMP Management Matters

Neglecting temporary BMPs can result in major setbacks, both environmental and financial. Poorly installed or maintained controls often fail during storms, leading to erosion, washouts, and regulatory enforcement actions.

By contrast, a well-managed BMP program provides measurable benefits:

  • Regulatory Protection: Prevents violations and fines under NPDES, TCEQ or local ordinances.
  • Reduced Liability: Keeps construction runoff contained and documented.
  • Operational Efficiency: Avoids costly cleanup or reinstallation work.
  • Community Confidence: Demonstrates environmental responsibility to inspectors, clients, and the public.

BMPs aren’t just regulatory requirements. They’re a visible reflection of your project’s professionalism and accountability.

Integration With SWPPP and Other Compliance Services

Temporary BMPs are most effective when integrated into a broader SWPPP compliance strategy. Red River Storm Water provides turnkey coordination between BMP management, SWPPP documentation, inspections, and reporting. That means no gaps, no overlap, and no confusion, just consistent, traceable compliance from start to finish.

Our systems are designed to work seamlessly with project engineers, general contractors, and environmental consultants, ensuring every site action aligns with your approved SWPPP.

Partner With Red River for Complete BMP Compliance

Red River Storm Water is more than a service provider, we’re a compliance partner. Our turnkey BMP services deliver the confidence that every control measure on your site is installed, inspected, and maintained to the highest standard.

From small residential developments to major infrastructure projects, we help construction professionals stay ahead of regulations, protect the environment, and build with integrity.

Contact Red River Storm Water today to schedule a consultation and discover how our temporary BMP solutions can safeguard your project and simplify compliance across every phase of construction.

Contact Form

Contact Us